top of page
MAST SUPPORT REPAIR ON LNG VESSEL
Location : Mediterranean - Offshore
Market : Offshore & Marine
Product used : C-CLAW S1000

Project Overview
The mission involved reinstalling a crane mast at the bow of the vessel. We secured the mast using eight C-CLAWs S1000, installed with a pneumatic version of our specially designed installation tool, developed specifically for this project to meet the ATEX requirements on board the LNG carrier.
The entire project was carried out while the vessel was underway, minimising disruption to operations.
Our team was called in just a few days before mobilisation and responded swiftly. Two of our field specialists embarked in Malta and disembarked in Turkey once the mast had been repaired.
bottom of page

_edited_edited.jpg)






