top of page

STRUCTURAL REPAIR INSIDE SWBT 

LOCATION : 

Malaysia - Offshore

KEY WORDS :

Cellular - structural repair - no hot work

MARKET :

Offshore & Marine

RIMG7590.JPG

JOB DESCRIPTION

Severe corrosion was discovered on a transverse bulkhead inside a water ballast tank of an FPSO in Malaysia.
The typical zolution would have involved a traditional crop-and-renew repair. However, due to the proximity of the a , hot work was considered too risky and was consequently postponed multiple times.
This is a textbook case for Cellular, a Cold Pad solution for structural repair, ideal for addressing local corrosion and plate thinning. Based on C-Claw (hyperlink) technology, Cellular requires no hot work, enabling safer and faster installation - even in ATEX zones!

This repair was carried out in collaboration with our valued partner AIG

bottom of page