top of page
Project Overview
The FPSO operator wanted to replace over 50 small pipe supports on top of a COT. Traditional methods would have involved shutting down the COT below and welding new supports.
Thanks to our bonded fastener C-CLAWs, the entire job could be done without any disruption to operations. Together with our local partner, we designed, manufactured, and replaced all the pipe supports.
bottom of page

_edited_edited.jpg)







