top of page

COT LEAK REPAIR

Location : Thailand - FPSO​

Market : Offshore & Marine

Product used : Leak Containment Kit

R0012722_edited_edited.jpg

Project Overview

During inspection, our client noticed a leak between a COT and an SWBT. Cold Pad's leak containment system was installed in the SWBT to contain the leakage and solve the issue.

The system is fastened with three C-CLAWs, making it non-intrusive and allowing for installation without hot work. It can be set up in ATEX zones without requiring a shutdown. This solution also requires a low POB (1 PAX) and can be installed in 2 days.

bottom of page