top of page

PIPE SUPPORT ON TOP OF COT

LOCATION :

Nigeria

KEY WORDS :

No shutdown - C-CLAW - Turn-key

MARKET :

Offshore & Marine

PARTNER INVOLVED :

Enerbull Limited

P3070382.JPG

JOB DESCRIPTION

​The FPSO operator wanted to replace 50+ small pipe supports on top of a COT. Traditional methods would have involved shutting down the COT below and welding new supports.

Thanks to our bonded fastener C-Claws, the full job could be done without any disruption of operations. Along with our local partner, we designed, manufactured, and replaced all the pipe supports.

bottom of page